Tactile · Physical Intelligence — Perit

What gets captured, and why it is worth having.

Environment: Kitchen counter, daylight
Captured with: Tactile glove, fingertip and palm pressure pads, wrist camera
Task: Pick up soft and fragile objects without damage

Vision tells a policy that a hand touched a cup; it does not say how firmly, or when the grip slipped. The tactile line adds a pressure map per fingertip and palm — or per gripper jaw — synchronised to the video, with contact onset, hold and release marked per event.

Tasks are chosen for contact richness: fragile and deformable objects, lids and fasteners, stacking with feedback, and hand-overs. Every episode ships with the raw pressure stream and the derived contact events, so you can re-threshold it yourself.

What it trains

How it is captured, and what you receive.

How it is captured

What you receive

Where it is recorded, and what people are asked to do.

Tasks are recorded where they actually happen — not in a studio dressed to look like a kitchen. Hover a room to see the kind of setting the protocol calls for.

Kitchens

Cooking preparation

Living rooms and bedrooms

Tidying and folding

Offices

Desk tasks

Retail and small shops

Shelf restocking

Warehouses and light industrial

Pallet to shelf

Workshops and labs

Tool handling

Agriculture and outdoor

Sorting produce

Client-defined and confidential

Proprietary workflows

Deliverables, and the labels you can add.

Deliverables

Annotation add-ons

How a pilot runs

Ten to thirty episodes, then the volume.

  1. 01day 0: The task family, the environments, the rig, the sensors, the episode count. One page, agreed before anything is bought or anyone is recruited.

  2. 02week 1: A written capture protocol — framing, lighting, where a task starts and ends, what counts as a failed take — and the kit list. Operators are trained and tested on it before a single episode is paid for.

  3. 03week 2: A small batch, ten to thirty episodes, delivered with QC status and a quality report. This is where the protocol breaks — on purpose, and cheaply.

  4. 04ongoing: You review the pilot, we fix the protocol, then the run scales on a weekly delivery cadence with the same report attached to every batch.

What QC checks, every time.